The implementation of the Electricity Act 2023 (as amended) [EA] in Nigeria will lead to significant developments in the deployment of renewable electricity systems in the Nigerian Electricity Supply Industry (NESI). The decentralization of the power system aims accommodate renewable technologies such as Battery Storage, Solar PV, Wind, Hydrogen, Biofuel, Waste-to-Power, Wave and Tidal Barrages, Biogas, Small, Medium & Large-Scale Hydro, etc. Most of these plants all have similar goals, to maximise their profitability by optimising the design, whilst ensuring that all necessary performance requirements imposed by the regulator, Nigerian Electricity regulatory Commission (NERC), and applicable State Electricity Regulatory Commission (SERC), are met. In addition, specific requirements of utilities in the NESI for integration into their networks must be satisfied.

At Idfon Power Engineering Consultants (iPEC) Limited, we offer a wide range of studies and services across the renewable and battery storage sector, covering conceptual design ideas, system analysis and detailed design activities. Typical services we offer can include:

  • Grid Connection Studies
  • NESIS-R 2015 Standards
  • Voltage Disturbance Studies
  • Harmonic Studies
  • Earthing Studies
  • Reactive Power Flow studies
  • Detailed modelling using PSSE/PSS SINCAL
  • Protection coordination and setting studies.
  • Insulation coordination studies
  • Arc Flash and Fault Level studies.
  • System Stability Studies
  • Concept Design & Development
  • Owner’s Engineer
  • Technical & Commercial Advisory Services
  • Independent Expert Review of proposals
  • Reliability & Availability studies
  • Protection Scheme Design
  • CT & VT Sizing Calculations
  • Cable Sizing Calculations
  • Network Design and Reinforcement Planning
  • Earthing Design and Analysis